Electrical projects,
start to finish

A selection of jobs we are proud of, from small residential call-outs to industrial automation. Each project has its own page covering what we found on site, what we fitted, and how it performed afterwards.

Residential

Consumer unit, three-storey house

An isolator per floor, a voltage monitoring relay with a main contactor, and 24 circuits in three RCD groups, each labelled on the cover.

3 floors 24 circuits
Commercial

Power factor correction, furniture store

A reactive power compensation panel with 7 capacitor steps and a three-phase reactor, driven by an 8-step automatic controller.

Furniture store 8 steps
Residential

Three-phase residential consumer unit

A three-phase board with 37 circuits, 30 mA residual current protection on every circuit, AFDD on six circuits and fully marked wiring.

Three-phase 37 circuits
Residential

Photovoltaic panel drone inspection

Inspecting a rooftop PV array from the air with an 8K-camera drone, on a building where terrace access was not possible.

1 hour Private homeowner
Residential

Residential panel upgrade

Replacing a fuseboard that no longer met safety standards, for a residential customer with no other utilities on site (no gas, no running water).

1 week and 26 hours Private homeowner
Residential

Rebuild after a lost neutral

After the supply neutral failed, every appliance in the property was destroyed. We rebuilt the installation so it could not happen again.

3 months + 1 day + 2 days Private homeowner
Industrial

Warehouse smoke extraction

Integrating the extraction fans with the fire detection system, while keeping the option to trigger them manually or isolate them completely.

1 day + 6 hours Auto repair garage
Commercial

Energy audit and periodic testing

Using a grid analyser to check for power factor problems, alongside routine maintenance of the consumer unit.

6 hours Restaurant
Commercial

Fuseboard upgrade at a 3D print farm

A new fuseboard for a 3D print farm that was losing power for seconds at a time, with a strobing effect across the workshop.

3 weeks + 12 hours 3D printing farm

We add projects as we finish them. If you have something similar in mind, ask for a quote and we will tell you up front what it involves.